The well encountered high quality oil bearing reservoir sands in the prolific Gamba formation. Results from logging indicate scope for the Hibiscus South field to contain materially higher oil reserves than the previous estimated range at the time of discovery of six to seven million barrels gross recoverable.
Hibiscus South is located approximately five kilometres south-west of the BW Mabomo production platform from where the DHBSM-1 discovery well was drilled to a total depth of 6,002 metres in
The Borr Norve jack-up rig has now commenced drilling operations on the Ruche sidetrack well (DRM-3H ST1).
Panoro holds a 17.5 per cent participating interest in the Dussafu Marin Permit.
"The five-month lead time at Hibiscus South from discovery to first oil is a prime example of our infrastructure led exploration strategy in action, showing how it can create material value for shareholders by allowing us to fast-track new high margin incremental oil barrels into production very cost effectively. The subsurface at Dussafu Marin has a history of delivering positive results and we are confident that this trend can continue long into the future as we progress towards unlocking its full organic growth potential."
Enquiries
Tel: +44 203 405 1060
Email: investors@panoroenergy.com
About
Visit us at www.panoroenergy.com.
Follow us on LinkedIn
https://news.cision.com/panoro-energy-asa/r/panoro-energy---hibiscus-south-onstream-five-months-after-discovery,c3942863
https://mb.cision.com/Main/399/3942863/2656341.pdf
(c) 2024 Cision. All rights reserved., source