QcX Gold Corp. announced that it has secured a diamond drill rig for its upcoming inaugural drill program on the Golden Giant Project in James Bay, Québec. The drill is expected to mobilize to site by the end of May 2021. Approximately 3,000m of drilling is planned for the drilling program, with holes planned on the Golden Giant East and Golden Giant West blocks. Drill hole planning is in the final review stage after compiling information from two geophysical surveys as well as surface exploration data. The program is expected to last approximately six to eight weeks. Selected drill holes have one or all of the following: 1) Gold values from grab samples taken during last summer’s surface exploration program. 2) A magnetic geophysical feature (from survey conducted in January, 2021). 3) An induced polarisation geophysical anomaly (from survey conducted in February, 2021).