RANHILL UTILITIES BERHAD
September 2022
E n r i c h i n g L i v e s T h r o u g h S u s t a i n a b l e S o l u t i o n s
AG E N DA
Corporate Snapshot
Business Overview & Sustainability
Prospects
Financials
Q & A
2 R A N H I L L U T I L I T I E S B E R H A D
C O M PA N Y S N A P S H O T
RANHILL AT A GLANCE
Geographical presence
• Interests in Environment, Power & Engineering- Asset Ownership & Long Term Contracts
Services
- Listed on the Main Market of Bursa Malaysia since 16 March 2016
Malaysia China Thailand
KEY INVESTMENT HIGHLIGHTS
FINANCIAL SNAPSHOT FYE2021
E R H A D
Strong water operator
with proven track record
23 years of operating track record with the lowest NRW per km pipeline
Defensive business nature
Environment and Power being basic needs to economic activities and social well being
Revenue | Gross Profit |
RM1,530 | RM339 million |
million |
U T I L I T I E S B
Tailwind | supported by | Dividend payout |
government initiatives | Dividend payout policy of 50 | |
Spillovers | from various | - 70% |
Government initiatives |
Profit before tax | PATAMI |
and zakat | |
RM 30.5 | |
RM 93 million | |
million | |
R A N H I L L
3
C O R P O R A T E S T R U C T U R E
Ranhill
Business | Environment | Energy | Services | ||||||||||||||||
sector | |||||||||||||||||||
Abstraction of raw | Operations and | Water and | |||||||||||||||||
Specific | water, treatment | Thailand BOT and | infrastructure, | ||||||||||||||||
China BOT and TOT | maintenance of | wastewater | |||||||||||||||||
of water, | Network & NRW | ||||||||||||||||||
business | distribution and | TOT and O&M | assets | two CCGT power | treatment, reclaimed | Management | energy, chemicals | ||||||||||||
assets | plants & solar | water and water | and resources | ||||||||||||||||
operation | sale of treated | plant | recycling | ||||||||||||||||
water | |||||||||||||||||||
Principal | Ranhill SAJ | Ranhill Water | Ranhill Water | Ranhill | |||||||||||||||
Ranhill Water | Ranhill Powertron, | ||||||||||||||||||
Technologies | Services | Bersekutu | |||||||||||||||||
Operating | Technologies | Ranhill Water | Ranhill | and | |||||||||||||||
Thailand & | Powertron II & | ||||||||||||||||||
Companies | (HK) Ltd | Ranhill Worley | |||||||||||||||||
Anurak Water | Ranhill Solar I | ||||||||||||||||||
Treatment | |||||||||||||||||||
R A N H I L L U T I L I T I E S B E R H A D
4
G E O G R A P H I C A L P R E S E N C E
• 12 wastewater treatment plants with concession period ranging from 25-30 years and design capacity of 227
MLD
• 10 Wastewater and reclaimed water treatment plant with concession period ranging from 8-25 years and design treatment design capacity of 112 MLD
• Source-to-Tap Water Supply Services in Johor
• 46 treatment plant with total treatment design capacity of 2,133 MLD
• Power Business in Sabah, Malaysia
• Largest IPP in Sabah with 380MW CCGT power plants in Kota Kinabalu Industrial Park
• 50MW LSS4 in Bidor, Perak
5 R A N H I L L U T I L I T I E S B E R H A D
Attachments
- Original Link
- Original Document
- Permalink
Disclaimer
Ranhill Holdings Bhd published this content on 28 September 2022 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 19 October 2022 10:52:59 UTC.