Resolute Mining Limited provided production guidance for the fiscal year 2020. The company is forecasting gold production for the fiscal year 2020 of 500,000oz at an AISC of USD 980/oz. Gold production from Syama is expected to be 260,000oz at an AISC of USD 960/oz. Syama sulphide production is expected to accelerate in the March 2020 quarter and be a strong performer for Resolute in fiscal year 2020. The Syama roaster is fully operational and operating at nameplate capacity. Underground mining will supply 100% of sulphide mill feed. Oxide circuit production will be supplied from stockpiles and ore mined from the Tabakoroni Open Pit Mine, located 32km south of the Syama processing plant, and from the Cashew, Tellem and Paysans satellite deposits located 5-10km south of the Syama processing plant. The Company continues to work towards its target of Syama annual production rates of 300,000oz at an AISC of USD 750/oz through the expansion of mining rates at the Syama Underground Mine and the addition of a future high-grade underground mine at Tabakoroni. At Mako, mining and processing will continue at similar rates to 2019, although ore grades will be lower due to depletion of high-grade stockpiles. Gold production from Mako for FY20 is expected to be 160,000oz at an AISC of USD 800/oz. The completion of Stage 1 of the Ravenswood Expansion Project (REP) has increased processing capacity at Ravenswood to 5Mtpa enabling a production target for the fiscal year 2020 to be set at 80,000oz of gold at an AISC of USD 1,200/oz.