Standard Uranium Ltd. announced that mobilization of the Standard Uranium exploration team and the Geotech drilling crew has commenced to the Company's flagship 25,886 hectare Davidson River Project, located in the Southwest Athabasca Uranium District of Saskatchewan 25 km to 30 km to the west of Fission Uranium's Triple R and NexGen's Arrow deposits. The Company is planning to drill 10,000 metres of diamond drill core to follow up on the results of recent drilling this past winter. This program will test the previously drilled Warrior and Saint trends and will branch out to test the Thunderbird and Bronco trends for the first time. Phase II Summer Drilling Program Summary: Objective is to make a basement hosted high-grade uranium discovery, 10,000 metres in approximately 20 drill holes planned, Drilling to commence first week of June, 2021, Follow-up drilling on the Warrior and Saint corridors with vectoring information gained during the 2020 Phase I and 2021 Phase II winter programs, Exploring two new corridors, Bronco and Thunderbird, through drill testing offsets and flexures along major conductive corridors searching for: radioactivity, alteration, structure, and graphite-rich and sulphide-rich shear zones, Increasing the geological knowledge and discovery potential of the Davidson River Property through collection and interpretation of technical information from strategically planned drill holes.