Talisker Resources Ltd. announce additional high-grade drill results highlighted by 38.17 g/t Au over 5.20 metres at its 100% owned flagship Bralorne Gold Project. Key Points: Talisker initiated resource conversion drilling on October 17, 2023, with 15,000 metres of planned drilling and completed the program on February 15, 2024. Hole SB-2024-008A intersected 97.40 g/t Au over 2.00 metres within a broader intercept of 38.17 g/t Au over 5.20 metres on the Alhambra Vein. Hole SB-2024-011 intersected 9.58 g/t Au over 1.90 metres within a broader intercept of 4.22 g/t Au over 8.15 metres on the BK-9870 Vein. The resource conversion drill program focused on increasing confidence in the Alhambra, BK and BK-9870 Veins. A total of 81 drill holes were drilled during the resource conversion program, totaling 14,949 metres. All 2023 assays have been received. Currently, there are 896 samples from the 2024 First Quarter drilling program at the assay laboratory awaiting to be received. SB-2024-008A Hole Description: All assays have been received. Located in the King block and hosted in diorite intrusive.
Intersected Alhambra Vein from 176.3-177.3m. SB-2024-011 Hole Description: All assays have been received. Located in the King block and hosted in diorite intrusive.Intersected BK-9870 Vein from 201.15-203.35m and 208.45-211.50m. Major vein structures intersected are considered classic Bralorne crack-seal quartz-carbonate veins with densely banded sulphide septae. Crack-seal septae host fine-grained arsenopyrite and pyrite mineralization. Alteration halos consist of strong silica-sericite±mariposite alteration halos.