BUNDARRA PRIMARY TARGET RC DRILLING PROGRAM UPDATE

SIGNIFICANT COPPER INTERSECTIONS AT 'ROGERS'

Duke Exploration Limited (ASX: DEX) ("Duke" or "the Company") is pleased to announce preliminary useresults from the reverse circulation (RC) drilling program that commenced in February 2022 at its flagship Bundarra project. This update is for the first 19 RC drill holes (4395m) that have been completed from the initial planned 28 hole program. The focus has been on scout drilling primary targets that are located in the southwestern portion of the Bundarra Intrusive Complex (BIC). These targets were previously identified as a direct result of the extensive exploration program conducted in Q3 and Q4, 2021 including soil sampling, geological ground truthing and assessment, Gradient Array Induced

Polarisation (GAIP) surveys, VTEM and airborne magnetics analysis over the entire BIC plus a 5-holepersonaldiamond drilling campaign completed in January 2022.

The Company has been experiencing two main challenges since late 2021 with inclement weather delays and extending assay turnaround times. The inclement weather has been well reported in the news and has caused a total loss of drilling time of approximately 21 days. Combined with this the assay turnaround times are continuing to extend. They are currently around 12 weeks from receipt of the ample into the lab and projected to extend further given a number of factors - pent up influx of work, COVID absences, consumable shortages and so on. The Company is doing its best to mitigate the impact of such factors and as such has taken the decision to report preliminary portable X-Ray Florescence (pXRF) analyser readings taken from each metre of RC drill chips, which are indicative of the presence and tenor of copper mineralisation. This will not be a usual ongoing practice but rather a temporary measure whilst such above mentioned factors are significantly impacting lead times for market reporting of drill results.

ForCautionary Statement

Portable XRF (pXRF) measurements of copper from RC chips are preliminary in nature and should be considered as an indication of the expected order of magnitude from final laboratory analysis. Previous data collected by Duke shows a strong positive correlation between pXRF and laboratory analyses for copper from RC drilling in the BIC. The analyses that are the subject of this report are all from samples that have been submitted for laboratory analysis and final results will be reported when available. It is expected that the final results will vary from those reported here.

Duke Exploration Limited | ABN: 28 119 421 868

P.O. Box 2057 Ascot QLD 4007

E: info@duke-exploration.com.au| www.duke-exploration.com.au

For personal use only

2

KEY POINTS

  • A total of 8 primary target areas including 3 new areas are currently being tested in the southwestern part of the BIC. The goal is to identify copper mineralised targets that have the potential to increase the current Resource base of the Bundarra project.
  • pXRF results are reported from the RC drill program which has to date completed 19 drill holes totalling 4,395m.
  • The Rogers-Browns South corridor is emerging with mineralisation over a strike length of 3,000m.
  • Anomalous copper intersected in all drill holes at Rogers, with the following significant intercepts highlighted:

0.25% Cu over 16m from 160m (BNRC009)

0.64% Cu over 35m from 0m

(BNRC010)

1.18% Cu over 5m from 143m

(BNRC010)

0.23% Cu over 16m from 96m

(BNRC012)

0.20% Cu over 11m from 0m

(BNRC013)

0.58% Cu over 11m from 18m

(BNRC013)

0.76% Cu over 7m from 23m

(BNRC014)

0.37% Cu over 10m from 39m

(BNRC015)

0.13% Cu over 12m from 69m

(BNRC015)

  • At Browns South BNRC001 intersected average pXRF grades of 0.57% Cu over 13 m from 229 m and BNRC002 intersected average pXRF grades of 0.21% Cu over 21 m from 177 m.
  • At Absolon BNRC020 drilled directly underneath the Absolon lode and intersected pXRF 0.12%Cu over 4 m from 137 m, which is 170m down dip of the surface exposure of the mineralised zone.
  • After the initial RC program follow up drilling is planned on targets that have the potential to be of sufficient scale and grade to support a mineral resource.

Duke Exploration Limited

www.duke-exploration.com.au

Ph +61 417 574 730
Managing Director
p.condon@duke-exploration.com.au
Toko Kapea
Chairman
Philip Condon
t.kapea@duke-exploration.com.au
Ph +64 27 534 2886
This announcement has been authorised for release by the Board.

3

Commenting on the RC Drilling results to date - Philip Condon, MD:

"We are very encouraged to report the first pXRF results from the RC drilling program targeting 8 prospects within the southwestern part of the BIC. This is the first part of this RC scout drilling phase and follows the successful diamond drilling campaign during Q4 2021 and Q1 2022 outside of our Mt

onlyFlora resource area. Of specific note is that the Browns South and Rogers prospects appear to be host to multiple zones of mineralisation within a 3 km NE trending structural corridor. This corridor will be further investigated by ensuing drilling programs. This RC program is on-going and we are anticipating reporting on investigations on the Quorn prospect next week."

For usepersonal

Duke Exploration Limited

www.duke-exploration.com.au

4

Bundarra RC Drilling Update

The current RC drilling program is scout testing high ranking prospects that are the most likely areas to host significant mineralisation with high grade and/or a large extent. New targeting techniques have been tested and confirmed through recent diamond drilling, which provided important geological and structural information. onlyStructural and alteration targets generated from a recent geophysics data synthesis and interpretation are also being integrated into the drilling program 1. This update presents results to date of pXRF analyses of RC chips for

the Browns South, Rogers and Absolon Prospects (Figure 1 - Figure 2).

On completion of this RC drilling program targets will be ranked for potential resource delineation drilling programs on the most promising target/s. It is anticipated that any resource drilling that may be justified will commence soon after the initial RC program with the aim of adding to the currently identified Mt Flora Resource at the Bundarra project.

For personal use

Figure 1: Location of the current drill holes relative to the BIC and Mt Flora.

1 20220518 DEX Bundarra Geophysical Data Synthesis Generates New Copper Targets

Duke Exploration Limited

www.duke-exploration.com.au

For personal use only

5

Figure 2: Completed holes drilled to date in the southwestern part of the BIC, corresponding with Table 1.

Table 1: Drill hole collar details (GDA94 MGA94 Zone 55) of exploration holes shown in Figure 2.

Prospect

Hole ID

Easting

Northing

RL (masl)

Depth (m)

Azimuth

Dip

BNRC001

653683

7566353

244

267

129

-60

Brown South

BNRC002

653590

7566463

252

249

139

-60

BNRC003

653498

7566573

260

279

143

-59

Cattle Creek

BNRC004

653456

7565316

226

249

141

-60

BNRC005

653548

7565206

225

249

141

-60

BNRC006

652297

7567351

277

249

318

-61

BNRC007

652389

7567241

278

225

327

-55

Absolon

BNRC008

652745

7567823

334

249

270

-55

BNRC020

652790

7568063

334

325

273

-59

BNRC021

652745

7568183

338

211

258

-55

BNRC009

655060

7567885

292

249

138

-56

BNRC010

655153

7567774

317

255

139

-56

BNRC011

655246

7567664

342

237

143

-56

BNRC012

655429

7567818

336

249

138

-55

Rogers

BNRC013

655337

7567929

303

255

139

-56

BNRC014

655244

7568039

292

149

144

-55

BNRC015

654924

7567394

338

218

139

-57

BNRC016

654831

7567504

332

249

142

-55

BNRC017

654745

7567615

345

249

142

-55

Duke Exploration Limited

www.duke-exploration.com.au

This is an excerpt of the original content. To continue reading it, access the original document here.

Attachments

  • Original Link
  • Original Document
  • Permalink

Disclaimer

Duke Exploration Ltd. published this content on 26 May 2022 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 26 May 2022 07:38:28 UTC.