ShareShare
  • Partage LinkedinLinkedin
  • Partage TwitterTwitter
  • Partage FacebookFacebook
  • Partage WhatsappWhatsapp
  • Partage mailMail

Stringent requirements

The recently sanctioned Shenandoah project is one of the next generation high-pressure/high temperature developments requiring 20,000 psi pressure ratings for deep water drilling in the Gulf of Mexico. Shenandoah is 160 mi (257 km) offshore Louisiana in Walker Ridge blocks 51, 52, and 53.

"Vallourec's industry leading technology in OCTG materials, connections and manufacturing will be key to the safe development and production of new, low carbon, deep water reserves in the US Gulf of Mexico," said Mark Chustz, Vice President of Well Operations, Beacon.

The special equipment, tubular solutions and connections comply with BSEE's regulations and guidelines.

Project expected in 2022

The drilling phase is expected to begin in Q3 2022, with first oil expected in Q4 2024. Vallourec will supply intermediate and production casing. The scope of supply includes the latest connection technology with VAM® SLIJ-3 and VAM® BOLT-II, custom sizes, and proprietary grades.

Trust
Quote

We are extremely pleased to be awarded this contract by BOE. It highlights their confidence in Vallourec seamless pipe and VAM® connection technology. We look forward to delivering quality solutions that allow our customers to operate safely, maximize value and optimize total cost of ownership.

Bertrand Frischmann SVP Vallourec North America
News
Filter:
  • CountryArrow
    • Corporate
    • USA
  • DateArrow
    • 2021
  • TopicArrow
    • VAM
Clear filters
Country Corporate USA
Date 2021
Topic VAM
Show Results
CorporateDecember 10 2021
VAM® SPRINT-FJ for High Tension and Maximum Clearance in Intermediate Strings
CorporateDecember 01 2021
VAM® connections prove worth for CO2 storage applications
CorporateNovember 24 2021
Validating VAM® connections for hydrogen storage
CorporateNovember 03 2021
VAM® 21, guaranteeing the highest performance thanks to extensive testing
CorporateSeptember 09 2021
Vallourec redesigns the VAM® Services website as part of its digital strategy for customers
CorporateJuly 07 2021
1 million and counting: why VAM® 21 is the connection of choice for oil companies worldwide

No item corresponds to your search. Please select other filters.

Long Arrow Long Arrow

Attachments

  • Original Link
  • Original Document
  • Permalink

Disclaimer

Vallourec SA published this content on 13 December 2021 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 13 December 2021 17:15:15 UTC.