Adamera Minerals Corp. announced that two drill holes have been completed on the VTEM-30 target on the Buckhorn 2.0 Gold Project in Washington State. The two holes were drilled to the south from a single site.

Both holes intersected zones of sulfides at the depths modelled from the geophysical data. The first hole which was drilled at an inclination of -85o, intersected zones with disseminated sulfides in locally fragmental and altered limestone /marble over a 60-metre core interval. The second hole which was drilled at an angle of -50o, repeated the mineralization and lithologies but over a 90-metre core interval.

the true thickness of these intervals has not been determined. Samples are being submitted to an accredited laboratory for assay. Other zones of disseminated sulfides intersected in each drill hole will also be submitted for gold assay.