Graphano Energy Ltd. announced that the trenching and channeling program at its historical Standard mine project ("Standard Project") has been completed and all assay results have been received. A drilling program at the Standard Project will be conducted this winter once the Company completes drilling at its Lac Aux Bouleaux graphite property ("LAB"). Select Results: Fourteen grab samples from this fall program yielded assay results between 1.26% Cg and 20.5% Cg with twelve of them grading over 11% (see Table 1).

Fifty-seven samples were collected from four trenching locations, yielding 6.21% Cg over 26 metres (m), 11.76% Cg over 10 m, 10.32% Cg over 9.5 m, and 5.06% Cg over 10m.