NCC LIMITED

INVESTOR PRESENTATION

May 15, 2024

Disclaimer

This presentation contains certain forward looking statements concerning NCC's future business prospects and business profitability, which are subject to a number of risks and uncertainties and the actual results could materially differ from those in such forward looking statements. The risks and uncertainties relating to these statements include, but are not limited to, risks and uncertainties regarding fluctuations in earnings, our ability to manage growth, competition (both domestic and international), economic growth in India and ability to attract and retain highly skilled professionals, time and cost over runs on contracts, our ability to manage operations, government policies and actions with respect to investments, fiscal deficits, regulations, geopolitical risks and Covid 19 pandemic, interest and other fiscal costs generally prevailing in the economy etc. Past performance of the company may not be indicative of future performance. The company does not undertake to make any announcement in case any of these forward-looking statements become materially incorrect in future or update any forward looking statements made from time to time by or on behalf of the company.

Copyright © 2017 NCC Limited

2

BUILDING INFRASTRUCTURE

MILESTONES

COMPANY OVERVIEW

FINANCIALS

PROJECTS SNAPSHOT

OUR VALUE PROPOSITION

Copyright © 2022 NCC Limited

4

Company Overview

Tinsukia Medical College, Assam

Company Overview

Second largest listed

construction

company by revenuePan India Presence

Strong Governance

credentials

(Four independent directors,

Independent Director as

Chairman & One non-

executive, non-independent

Director)

Well

Diversified

Business

Model

Marquee

Investors, listed

12,500+ employees

since 1992

(including contractual)

EPC company with in-house design and engineering capabilities

Diversified order

book of

Rs. 57,536 Cr.

Copyright © 2022 NCC Limited

6

Company Overview: Business Verticals

Buildings Transportation

Water &

Electrical (T&D)

Irrigation

Environment

Mining Railways

Hospitals &

Access Controlled

Medical colleges

Highways

like AIIMS

Complete EPC for

Airports

the Road projects

Sports Complexes

Air Strips and

Housing Projects

Related

IT Parks

Infrastructure

Industrial &

Metros

Commercial

Tunneling

Buildings

Bridges and

Flyovers

  • Water supply projects
  • Water treatment plants
  • Water distribution networks
  • Underground drainages
  • Sewage treatment plants
  • Lift irrigation schemes

Transmission and

Dams &

distribution lines

Reservoirs

and sub-stations

Canals

Project

Tunnels

electrification

Barrages,

System

Spillways and

Improvement

Aqueducts

Projects

  • Smart Meters

Overburden

Civil EPC

Removal

Track Laying

Coal Excavation &

Signaling and

Transportation

Telecommunication

MDO

Dedicated Freight

Corridor

High Speed Rail

Copyright © 2022 NCC Limited

7

Company Overview: Group Structure

S. No.

Particulars

FY24

Revenue

Mix %

1

Construction

97.77%

(NCC Limited, Pachhwara Coal Mining Private Limited, J Kumar NCC Private

Limited and Others)

2

Real Estate

1.80%

(NCC Urban Infrastructure Limited)

3

Others

0.43%

(BOT Roads & Others)

Total

100.00%

Copyright © 2022 NCC Limited

8

Company Overview: Client List

Chennai Metro Rail Ltd

MSRDC

Copyright © 2022 NCC Limited

9

Financials

CCS International Airport, Lucknow

Attachments

  • Original Link
  • Original Document
  • Permalink

Disclaimer

NCC Limited published this content on 15 May 2024 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 15 May 2024 12:21:49 UTC.