Abbreviation
The Company | RATCH Group Public Company Limited |
The Group | RATCH Group Public Company Limited and its subsidiaries |
EGAT | Electricity Generating Authority of Thailand |
COD | Commercial Operation Date |
EBITDA | Earnings before Interest, Tax, Depreciation and Amortization |
FX | Foreign Exchange Rate |
IPP | Independent Power Producer |
PPA | Power Purchase Agreement |
SPP | Small Power Producer |
Projects/Companies
ABEIF | An Binh Energy and Infrastructure Fund, an indirect joint venture in proportion of 49 percent |
HKH | Hin Kong Power Holding Company Limited, a joint venture in proportion of 51 percent |
HKP | Hin Kong Power Company Limited, an indirect joint venture wholly-owned by HKH |
HPC | Hongsa Power Company Limited, an indirect joint venture in proportion of 40 percent |
NRER | Nexif Ratch Energy Rayong Company Limited, an indirect joint venture wholly-owned by NRES |
NRES | NEXIF RATCH ENERGY SINGAPORE PTE LTD, an indirect joint venture in proportion of 49 |
percent | |
RAC | RATCH-Australia Corporation Pty Ltd, a wholly-owned indirect subsidiary |
RCO | RATCH Cogeneration Company Limited, a subsidiary in proportion of 99.97 percent |
RG | Ratchaburi Electricity Generating Company Limited, a wholly-owned subsidiary |
RHIS | RH International (Singapore) Corporation Pte Ltd, a wholly-owned indirect subsidiary |
RIAU | PT Medco Ratch Power RIAU, an indirect joint venture in proportion of 49 percent |
RPCL | Ratchaburi Power, an indirect joint venture in proportion of 25 percent |
SEAN | Southeast Asia Energy Limited, a joint venture in proportion of 33.33 percent |
Page 1
Management Discussion and Analysis
For the 1st Quarter Ended 31 March, 2021
Executive Summary
Unit : Million baht | |||||
Quarter 1 | |||||
Increase | % | ||||
(Decrease) | |||||
2021 | 2020 | ||||
Total revenues | 8,701.32 | 11,191.75 | (2,490.43) | (22.3) | |
Total cost and expenses | 6,881.12 | 9,207.89 | (2,326.77) | (25.3) | |
EBITDA | 2,650.04 | 2,870.08 | (220.04) | (7.7) | |
Gain (Loss) on FX | 267.66 | (623.03) | 890.69 | 143.0 | |
Profit to owner of the Company | 2,087.86 | 1,360.82 | 727.04 | 53.4 | |
Profit before FX | 1,820.20 | 1,983.85 | (163.65) | (8.2) | |
The operating result for the 1st quarter of 2021 showed the profit (attributable to owners of the Company) of THB 2,087.86 million, increasing from the same period of the previous year by THB 727.04 million. The increase is owing to the gain on FX which increased the profit in the amount of THB 890.69 million. Without the effect of FX of the Company and subsidiaries, the operating result for the 1st quarter of 2021 showed the profit of THB 1,820.20 million, decreasing from the same period of the previous year by THB 163.65 million. The decrease is owing to planned maintenances of RG and HPC. While, hydro power plant's performance increased due to higher electricity generation.
Page 2
Management Discussion and Analysis
For the 1st Quarter Ended 31 March, 2021
1. Significant Events of the 1st Quarter of 2021
1.1 Shareholding in Bangkok Aviation Fuel Services Public Company Limited
On January 19, 2021, the Company has been completely transferred the shares of Bangkok Aviation Fuel Services Public Company Limited ("BAFS") for 98,983,125 shares (or equivalent to 15.53 percent of total issued and paid-up shares in BAFS) from Thai Airways International Public Company Limited ("THAI"). The purchase price is THB 27.40 per share at the total amount of THB 2,712.14 million. The Company already paid a total share purchase price to THAI.
1.2 Full Operation Commencement of Yandin Wind Farm in the Commonwealth of Australia
On March 19, 2021, Yandin Wind Farm in the Commonwealth of Australia, the Company held 70 percent through RAC, has achieved Interim Approval from the grid connection authority and entered commercial operation at full capacity, while remaining commissioning certifications continue to be completed.
Yandin Wind Farm has the capacity of 214.2 megawatts with a 15-year PPA with Alinta Sales
Pty Ltd.
1.3 Full Operation Commencement of Collector Wind Farm in the Commonwealth of Australia
On April 7, 2021, Collector Wind Farm in the Commonwealth of Australia, the Company held 100 percent through RAC, entered commercial operation at full capacity. The project has two long term PPAs covering 79.6 percent of output. These are with Infigen Energy for 60 percent of output and ALDI Foods Pty. Ltd. (a subsidiary of global supermarket company, ALDI) for 19.6 percent of generation and the remaining electricity generated will be sold in the Commonwealth of Australia's National Electricity Market. Both PPAs can now operate while remaining commissioning test and certifications are finalized with the grid connection authority.
Page 3
Management Discussion and Analysis
For the 1st Quarter Ended 31 March, 2021
Progress of Projects under Construction (as of March 31, 2021)
Riau Power Plant | ||
Type of Fuel | Natural Gas | |
Install Capacity (MW) | 296.23 | |
Location | Republic of Indonesia | |
Ownership | 49% | |
PPA | 20 years with PT PLN | |
COD | Year 2021 | |
Progress | 96.66% | |
MRT Pink Line Project | ||
Technology | Monorail | |
Route | Khae Rai-Min Buri | |
Ownership | 10% | |
Contract Term | 30 years | |
COD | Year 2022 | |
Progress | Civil Works = 76.13% | |
Railway System = 68.73% | ||
MRT Yellow Line Project | ||
Technology | Monorail | |
Route | Lad Prao-Sam Rong | |
Ownership | 10% | |
Contract Term | 30 years | |
COD | Year 2022 | |
Progress | Civil Works = 80.44% | |
Railway System = 71.18% | ||
Page 4
This is an excerpt of the original content. To continue reading it, access the original document here.
Attachments
- Original document
- Permalink
Disclaimer
Ratchaburi Electricity Generating Holding pcl published this content on 14 May 2021 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 14 May 2021 01:15:06 UTC.