Shanta Gold Limited announced an exploration drilling update for its New Luika Gold Mine ("New Luika") for the period December 2023 to end February 2024 and Singida Gold Mine ("Singida") being for the period September 2023 to early March 2024. Assay results are from an onsite laboratory at New Luika operated by an independent third party. Assay results are from the accredited independent commercial laboratory (SGS Mwanza).

The mineralised structure has been tested to levels 930 mRL to 1,005 mRL (30 m to 95 m from surface) with holes spaced using 20m to 50 m drill fences. Assay results are from a onsite laboratory at NewLuika operated by an independent thirdparty.