RESULTS

FOURTH QUARTER AND YEAR 2022

Investor Relations:

Raul Jacob Victor Pedraglio +(602) 264-1375southerncopper@southernperu.com.pewww.southerncoppercorp.com

February 2nd, 2023

Southern Copper Corporation (NYSE and BVL: SCCO)

  • 4Q22 net sales were $2,820.3 million, in line with 4Q21 net sales. Sales volumes increased for copper (+2.1%), silver (+6.4%) and zinc (+38.2%) and decreased for Molybdenum (-15.7%). While molybdenum price rose 14.2% during the quarter, prices dropped for copper (-17.5%), silver (-11.1%) and zinc (-9.0 %), offsetting the positive impact of higher sales volumes.

In 2022, net sales decreased 8.1% compared to the figure in 2021. This result was driven by a decrease in the sales volume for copper (-6.5%), silver (-1.9%) and molybdenum (-13.4%). The sales volume for zinc increased 10.5% and its price was up 16.2%. Metal prices for molybdenum also increased 20% when compared with 2021, while metal prices decreased for copper (-5.4%) and silver (-13.6%).

  • Net income in 4Q22 was $902.4 million, which represented a 8.3% increase with regard to the $833.0 million registered in 4Q21. The net income margin in 4Q22 was 32.0%, versus 29.5% in 4Q21.
    2022 net income was $2,638.5 million, 22.3% lower than in 2021. The net income margin in 2022 was 26.3%, versus 31.1% in 2021.
  • 4Q22 adjusted EBITDA was $1,647.5 million, which represented a decrease of 4.6% with regard to the $1,726.5 million registered in 4Q21. The adjusted EBITDA margin in 4Q22 was 58.4% versus 61.1% in 4Q21.
    Adjusted EBITDA in 2022 was $5,365.3 million; 21.7% below the figure in 2021. The adjusted EBITDA margin in 2022 was 53.4% vs 62.7% in 2021.
  • Cash flow from operating activities in 2022 was $2,802.5 million, which represented a decrease of 34.7% over the $4,292.4 million posted in 2021.
  • Copper production registered an increase of 1.6% in 4Q22 in quarter-on-quarter terms. Higher production at our Peruvian mines was mainly attributable to an uptick in ore recoveries. Copper production at our Mexican mines was in line with 2021 production.
    2022 overall Copper production decreased 6.6% YoY to 894,703 tons. The yearly drop was attributable to the Cuajone stoppage (22,208 tons) and a temporary decline in ore grades (38,106 tons).
  • Quarter by-productproduction: Mined silver production increased 9.6% in 4Q22, driven upward by higher production at our IMMSA, Buenavista and Cuajone operations. Molybdenum production decreased (-15.6)% in 4Q22 compared to 4Q21, which was primarily attributable to lower production at the Toquepala mine. Mined zinc production decreased 7.4% this quarter, mainly due to a drop in production at the Charcas unit.
    Year by-productproduction: Molybdenum production was 26,240 tons in 2022, which was 13.3% lower than the figure in 2021. This drop was due to a reduction in production at the Toquepala mine, which was driven by lower ore grades. Mined zinc production fell 10.4% YoY due to a decrease production at the Charcas and Santa Barbara mines. Mined silver production dropped 2.1% in 2022, which reflected a decrease in production at our Peruvian

FOURTH QUARTER AND YEAR 2022 RESULTS

SOUTHERN COPPER

operations and at La Caridad mine. This reduction was partially offset by an increase in production at our Buenavista and IMMSA mines.

  • 4Q22 Operating cash cost per pound of copper, net by-product revenue credits, was $0.45, which represented a decrease of 41.6% compared to the $0.76 reported in 4Q21. The aforementioned result was mainly attributable to an increase in the by-product revenue credits, principally from molybdenum.
    2022's Operating cash cost per pound of copper, including by-product revenue credits, was $0.78, which represented an increase of 16.5% compared to the $0.67 reported in 2021. This result was mainly attributable to an increase in the production cost and to the unit cost effect generated by a 6.6% decrease in pounds of copper produced. This result was partially offset by an increase in the by-product revenue credits.
  • In 2022, we spent $948.5 million on capital investments, which reflected a 6.3% increase YoY and represented 36.2% of net income in 2022.
  • Dividends: On January 26, 2023, the Board of Directors authorized a dividend of $1.00 per share payable on March 1st, 2023 for shareholders of record at the close of business on February 14th, 2023.

Mr. German Larrea, Chairman of the Board, commenting on the Company´s progress and current circumstances, said: "2022 was a challenging year. The world expected a return to some semblance of stability in 2022 after COVID-19 lockdowns, but the upturn was sideswiped by the Russia-Ukraine conflict. This war has produced significant volatility, affecting economies, energy markets and global security. The aforementioned context, coupled with additional challenges in the economies in which we operate, tested our strengths and ability to generate cash flows. Despite headwinds on the external front and a series of atypical local events─ namely the Cuajone stoppage in 2022─we have persevered, bolstered by the resilience of our workforce, SCC's strengths and our strong financial position. Evidence of our fortitude can be seen in the 4Q22 comparison to 3Q22. Net sales were up 30.8% over the same period. Consistent with these positive results, the operating cash cost per pound of copper, including by-product revenue credits, was $0.45 per pound, 57% lower than the $1.03 reported in 3Q22.

In Peru, on December 7, 2022, the Peruvian congress invoked its powers under the Constitution and removed President Pedro Castillo from office. Mrs. Dina Boluarte, the Vice President, immediately assumed the presidency. These fast- moving events led to considerable upheaval, particularly in the south of Peru, where acts of vandalism and violence have escalated. Roadblocks are scattered throughout the country, which has negatively affected the normal course of business in various regions. Fortunately, our operations have not been impacted. SCC hopes that the government will take clear action to restore order, protect the rights of all citizens and set the stage for a peaceful solution to protests so that Peru can resume growth and achieve the development it deserves.

We continue to focus on expansion and expect to deliver ore to the Caridad concentrator from the Pilares mine in 2Q23, contributing with 35,000 tonnes of copper annually. Additionally, the new zinc concentrator at Buenavista is expected to begin operations in 2H23 generating 100,000 tons of zinc and 20,000 tons of copper per year."

4Q22

www.southerncoppercorp.com

Page 2 of 12

FOURTH QUARTER AND YEAR 2022 RESULTS

SOUTHERN COPPER

Key Financial Data

Fourth Quarter

Twelve Months

2022

2021

Variance

2022

2021

Variance

$

%

$

%

(in millions except per share amount and %s)

Sales

$2,820.3

$2,823.7

$(3.4)

(0.1)%

$10,047.9

$10,934.1

$(886.2)

(8.1)%

Cost of sales

1,206.8

1,037.6

169.2

16.3%

4,649.1

3,894.4

754.7

19.4%

Operating income

1,370.0

1,530.6

(160.6)

(10.5)%

4,435.8

6,065.1

(1,629.3)

(26.9)%

Net income

$902.4

$833.0

$69.4

8.3%

$2,638.5

$3,397.1

$(758.6)

(22.3)%

Net income margin

32.0%

29.5%

2.5pp

8.5%

26.3%

31.1%

(4.8)pp

(15.4)%

Adjusted EBITDA

1,647.5

1,726.5

(79.0)

(4.6)%

5,365.3

6,852.7

(1,487.4)

(21.7)%

Adjusted EBITDA margin

58.4%

61.1%

(2.7)pp

(4.4)%

53.4%

62.7%

(9.3)pp

(14.8)%

Income per share

$1.17

$1.08

$0.09

8.3%

$3.41

$4.39

$(0.98)

(22.3)%

Capital investments

290.9

196.7

94.2

47.9%

948.5

892.3

56.2

6.3%

Capital Investments

Our current capital investment program for this decade exceeds $15 billion and includes investments in the Buenavista Zinc, Pilares, El Pilar and El Arco projects in Mexico and in the Tia Maria, Los Chancas and Michiquillay projects in Peru. This capital forecast includes several infrastructure investments, including key investments to bolster the competitiveness of the El Arco project.

Mexican Projects

Buenavista Zinc - Sonora:This project is located within the Buenavista deposit, where a new concentrator is being built. This facility has a production capacity of 100,000 tons of zinc and 20,000 tons of copper per year. We have completed the engineering study, and the project has all the necessary permits. When operating, this facility will double the Company's zinc production capacity and provide more than 2,000 operational jobs.

Project update: the capital budget of the project is $416 million, most of which has already been invested. We expect to initiate operations in 2H23.

Pilares - Sonora:Located 6 kilometers from La Caridad, this project consists of an open-pit mine operation with an annual production capacity of 35,000 tons of copper in concentrate. This project will significantly improve the overall mineral ore grade (considering the 0.78% expected from Pilares and the 0.29% from La Caridad).

Project update: The budget for Pilares is $159 million, most of which has already been invested. The project is currently operating and delivering copper mineral oxides to the SX-EW facilities of the Caridad operation. We expect to produce mineral for the Caridad concentrator at full capacity in the 2Q23.

El Pilar - Sonora: This low-capital intensity copper greenfield project is strategically located in Sonora, Mexico, approximately 45 kilometers from our Buenavista mine. Its copper oxide mineralization contains estimated proven and probable reserves of 317 million tons of ore with an average copper grade of 0.249%. We anticipate that El Pilar will operate as a conventional open-pit mine with an annual production capacity of 36,000 tons of copper cathodes. This operation will use highly cost efficient and environmentally friendly SX-EW technology. The budget for El Pilar is $310 million.

4Q22

www.southerncoppercorp.com

Page 3 of 12

FOURTH QUARTER AND YEAR 2022 RESULTS

SOUTHERN COPPER

Project update: The results from experimental pads in the leaching process have confirmed adequate levels of copper recovery. Basic engineering study is finished and the Company continue to develop the project and engage in onsite environmental activities. The SX-EW plant EPCM project has been awarded to a contractor and has started. We expect production to begin in 2024 and mine life is estimated at 13 years.

El Arco - Baja California: This is a world-class copper deposit located in the central part of the Baja California peninsula with ore reserves of over 1,230 million tons with an average ore grade of 0.40% and 141 million tons of leach material with an average ore grade of 0.27%. The project includes an open-pit mine combining concentrator and SX-EW operations. Annual production is expected to total 190,000 tons of copper and 105,000 ounces of gold.

Project update: The Company has completed the environmental baseline study for the mine and industrial facilities and is reviewing the basic engineering analysis to request the environmental impact permits,

Peruvian Projects

Tia Maria - Arequipa:This greenfield project, located in Arequipa, Peru, will use state of the art SX-EW technology with the highest international environmental standards to produce 120,000 tons of SX- EW copper cathodes per year. The estimated capital budget for the project is $1.4 billion.

Southern Copper has been consistently working to promote the welfare of the population of the Islay province. As part of these efforts, we have implemented successful social programs in education, healthcare and productive development to improve the quality of life in the region. We have also promoted agricultural and livestock activities in the Tambo Valley and supported growth in manufacturing, fishing and tourism in Islay.

We reiterate our view that the initiation of construction activities at Tia Maria will generate significant economic opportunities for the Islay province and the Arequipa region. Given the current Peruvian economic situation, it is crucial to move ahead on projects that will stimulate a sustainable growth cycle. We will make it a priority to hire local labor to fill the 9,000 jobs that we expect to generate during Tia Maria's construction. Additionally, from day one of our operations, we will generate significant contributions to revenues in the Arequipa region.

Los Chancas - Apurimac: This greenfield project, located in Apurimac, Peru, is a copper and molybdenum porphyry deposit. Current estimates of indicated copper mineral resources are 98 million tons of oxides with a copper content of 0.45% and 52 million tons of sulfides with a copper content of 0.59%. The Los Chancas project envisions an open-pit mine with a combined operation of concentrator and SX-EW processes to produce 130,000 tons of copper and 7,500 tons of molybdenum annually. The estimated capital investment is $2,600 million and the project is expected to begin operating in 2030. In 2022, we continued to engage in social and environmental improvements for the local communities and worked on the project's environmental impact assessment.

Project update: As of December 31, 2022 part of the project´s land continued to be occupied by illegal miners, some of whom have irregularly registered their stakes in the "Integral Registry of Mining Formalization" (REINFO) The Company has filed criminal complaints and other legal remedies, which have annulled the claims of 70 illegal miners while 5 cases remain open.

Michiquillay Project - Cajamarca: In June 2018, Southern Copper signed a contract for the acquisition of the Michiquillay project in Cajamarca, Peru. Michiquillay is a world class mining project with inferred mineral resources of 2,288 million tons with an estimated copper grade of 0.43%. When developed, we expect Michiquillay to produce 225,000 tons of copper per year (along with by-products of molybdenum, gold and silver) for an initial mine life of more than 25 years and at a competitive cash-cost. We estimate an investment of approximately $2.5 billion will be required and expect production start-up by 2032. Michiquillay will become one of Peru´s largest copper mines and will create significant business opportunities in the Cajamarca region; generate new jobs for the local communities; and contribute with taxes and royalties to the local, regional and national governments.

4Q22

www.southerncoppercorp.com

Page 4 of 12

FOURTH QUARTER AND YEAR 2022 RESULTS

SOUTHERN COPPER

In 2021, the Company signed Social Agreements with the Michiquillay and the Encañada Communities. In addition to this, on October 1, 2021, the Peruvian Ministry of Energy and Mines approved the semi-detailed Environmental Impact Study for the project.

Project update: In 4Q22, the Company informed MINEM that it had begun exploration activities and initiated an assessment of the existing mineral resource at depth. In 2022, in accordance with our social agreements with the Michiquillay and La Encañada communities, the Company hired unskilled labor and paid for the use of surface land. SCC will continue to make surface land payments in 2023 and plans to support social programs in both communities as it rolls out additional exploration activities.

Environmental, Social & Governance (ESG) Investment

Progress on the Corporate Sustainability Assessment front. S&P Global increased SCC's rating by 13% YoY in its Corporate Sustainability Assessment 2022. This situates the company among the top 8% of best performers in the mining sector and places SCC 50% above the average rating. These results reflect the upward trend the Company is experiencing in the realm of sustainability and reaffirms SCC's listing on the Dow Jones Sustainability Index (DJSI) for the Latin American Integrated Market (MILA) for the fourth consecutive year. Our on-goingimprovement has been driven by positive performance in areas such as cybersecurity, water management, operations closure, occupational safety and health, among others.

The open-pitmine La Caridad and the Sonora Metallurgical Complex (smelter and refinery) received Copper Mark certification. Both units were assessed by this independent assurance system to demonstrate that SCC's copper is produced responsibly and highlight the Company's contributions to achieving the Sustainable Development Goals of the United Nations in 5 main areas: business and human rights, community, working conditions, environment and governance.

SCC's goal is to ensure that copper production at all of our units meets Copper Mark's criteria. Additionally, La Caridad received the Molybdenum Mark. The aforementioned pilot programs were implemented by Copper Mark and the International Molybdenum Association so producers have a framework of reference to demonstrate leadership with regard to sustainability and responsible production practices.

Occupational Safety. The Mining Chamber of Commerce of Mexico (CAMIMEX) and the National Council to Regulate and Certify Workplace Practices (CONOCER) awarded first place to the rescue squads of the Charcas and Santa Barbara units in the categories "Underground Mining Rescue" and "First Aid" respectively in the framework of the XVI National Competition of Underground Mining Rescues, First Aid and Hazardous materials.

Fundación Grupo México organized a Volunteer Day, which was attended by 8 thousand volunteers in 13 states of Mexico and 5 regions of Peru. Efforts benefitted more than 40 institutions near our operations with a focus on improving the quality of life at the community, family, and environment levels.

4Q22

www.southerncoppercorp.com

Page 5 of 12

This is an excerpt of the original content. To continue reading it, access the original document here.

Attachments

  • Original Link
  • Original Document
  • Permalink

Disclaimer

Southern Copper Corporation published this content on 02 February 2023 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 02 February 2023 23:47:05 UTC.