ASX Release

31 August 2017

VALOR RESOURCES LIMITED ACN 076 390 451

22 Lindsay Street PERTH, WA

Australia

Tel: +61 8 9200 3467

Fax: +61 8 9227 6390

Contact:

Mr Mark Sumner

E-mail:

info@valorresources.com.au

Directors

Mr Mark Sumner Mr Brian McMaster Ms Paula Cowan

Company Secretary

Ms Kelly Moore Ms Paula Cowan

ASX Code: VAL

FURTHER EXCEPTIONAL DRILL RESULTS AT BERENGUELA INCLUDING 3M AT OVER 4,000 G/T Ag & 5.42% Cu

Valor Resources Limited ("VAL" or the "Company", ASX: VAL) is pleased to report the second assay results from the drilling program at the Berenguela Copper-Silver Project in Southern Peru.

Highlights:

  • High grade intercepts including 8m @ 2.95% Copper (Cu) and >2,161.23 g/t Silver (Ag), 14.64% Manganese (Mn) and 0.49% Zinc (Zn)

  • 3m interval @ 5.42% Cu and Ag values over 4,000 g/t, exceeding the limits of SGS lab tests

  • Further assay results to be released shortly

  • Updated resource estimate pending

Key Drilling Intercepts (refer to Tables 1 & 2 for complete results): BEP029-BER246*:

16m @ 1.88% Cu + 1,243.31 g/t Ag + 10.43% Mn + 0.39% Zn (from 59).

8.372% CuEq, including:

o 8m @ 2.95% Cu + 2,161.23 g/t Ag + 14.64% Mn + 0.49% Zn (from 63m).

14.154% CuEq

*BER246 exceeded 4,000 g/t Ag maximum limit of SGS Lab tests.

BEP029- BER243:

54m @ 1.48% Cu + 202.66 g/t Ag + 14.47% Mn + 0.27% Zn (from 37m).

2.625% CuEq, including:

o 8m @ 2.09% Cu + 754.13 g/t Ag + 20% Mn + 0.38% Zn (from 37m).

6.091% CuEq;

BEP023 - BER240:

23m @ 1.33% Cu + 167.65 g/t Ag + 10.23% Mn + 0.23% Zn (from 26m).

2.27% CuEq.

BEP029 - BER245:

14m @ 1.07% Cu + 186.18 g/t Ag + 9.83% Mn + 0.71% Zn (from 20m).

2.323% CuEq, including:

8m @ 1.47% Cu + 252.96 g/t Ag + 12.95% Mn + 0.93% Zn (from 22m) 3.149% CuEq.

Management Commentary

Valor Chairman, Mark Sumner said: "The intercepts from this drill program continue to confirm that the Berenguela Project is a high-quality copper-silver asset, with potentially valuable manganese and zinc credits. We are intercepting grades that are unprecedented for this deposit, which only increases our enthusiasm for Berenguela.

"Hitting numerous intervals over 1,000 g/t Ag confirms that our geology is exceptional, but hitting grades so high that we've exceeded the limits of SGS' testing has surpassed our expectations. We will seek to determine the maximum silver grades and report on these results as soon as possible. In the meantime, we will continue to drive the project forward with ongoing drilling which is expected to unlock further value for shareholders. Berenguela is shaping up to be an outstanding multi-commodity asset."

Key Drilling Intercepts continued (refer to Tables 1 and 2 for complete drilling results): BEP023 - BER239:

27 m @ 1.01 Cu% + 117.80 Ag g/t + 8.73 Mn% + 0.26 Zn% (from 30 m). 1.723% CuEq

BEP029 - BER244:

50 m @ 1.39 Cu% + 130.77 Ag g/t + 11.63 Mn% + 0.34 Zn% (from 14 m). 2.202% CuEq, including:

9 m @ 3.02 Cu% + 107.11 Ag g/t + 9.45 Mn% + 0.24 Zn% (from 32 m). 3.671% CuEq

10 m @ 1.24 Cu% + 177.18 Ag g/t + 18.11 Mn% + 0.5 Zn% (from 41 m). 2.359% CuEq

BEP029 - BER242:

26 m @ 0.91 Cu% + 105.30 Ag g/t + 7.14 Mn% + 0.63 Zn% (from 9m). 1.715% CuEq

Drilling Program Overview

The drilling program commenced on 10 July 2017. The program includes 66 drill holes for a total of 9,570 metres, targeting depths between 100 and 200 metres focusing primarily on the Berenguela central deposit area, with select drill holes targeting mineralisation outside of the area current Inferred Resource shell. To date, 24 holes for a total of 3,655m have been completed. The drill holes are spaced on 35m x 35m grid and were performed from 11 platforms (BEP-002, BEP-003, BEP-005, BEP-006, BEP-007, BEP-008, BEP-021, BEP-022, BEP-023, BEP- 025, BEP-029).

Figure 1 - 2017 Drilling Platform Map Table 1: Drillhole Results at the Berenguela Project*

Platform

Hole Id

Comments

From (m)

To (m)

Interval (m)

% eCu Excl Mn

Summary

%eCu Cutoff

BEP-006

BER223-17

4

11

7

0.851

7 m @ 0.69 Cu% + 17.44 Ag g/t + 1.16 Mn% + 0.17 Zn%

0.50

26

49

23

0.963

23 m @ 0.54 Cu% + 41.17 Ag g/t + 4.31 Mn% + 0.5 Zn%

0.50

66

69

3

0.624

3 m @ 0.26 Cu% + 40.47 Ag g/t + 3.43 Mn% + 0.37 Zn%

0.50

79

90

11

0.735

11 m @ 0.43 Cu% + 28.11 Ag g/t + 4.36 Mn% + 0.38 Zn%

0.50

113

175

62

1.574

62 m @ 0.6 Cu% + 109.92 Ag g/t + 8.98 Mn% + 0.97 Zn%

0.50

BER224-17

4

47

43

0.582

43 m @ 0.42 Cu% + 16.69 Ag g/t + 2.26 Mn% + 0.18 Zn%

0.50

65

92

27

0.531

27 m @ 0.35 Cu% + 19.70 Ag g/t + 2.1 Mn% + 0.19 Zn%

0.50

BER225-17

5

68

63

1.570

63 m @ 1.08 Cu% + 40.84 Ag g/t + 7.62 Mn% + 0.66 Zn%

0.50

BER226-17

10

45

35

1.640

35 m @ 0.62 Cu% + 90.35 Ag g/t + 12.6 Mn% + 1.31 Zn%

0.50

52

61

9

0.886

9 m @ 0.63 Cu% + 25.03 Ag g/t + 4.38 Mn% + 0.3 Zn%

0.50

BEP-007

BER227-17

2

73

71

1.650

71 m @ 0.82 Cu% + 111.09 Ag g/t + 6.81 Mn% + 0.62 Zn%

0.50

100

112

12

0.586

12 m @ 0.35 Cu% + 23.73 Ag g/t + 2.96 Mn% + 0.27 Zn%

0.50

BER228-17

7

92

85

0.952

85 m @ 0.55 Cu% + 38.66 Ag g/t + 5.4 Mn% + 0.48 Zn%

0.50

BER229-17

11

42

31

1.047

31 m @ 0.59 Cu% + 28.43 Ag g/t + 10.58 Mn% + 0.73 Zn%

0.50

50

54

4

0.572

4 m @ 0.3 Cu% + 19.93 Ag g/t + 3.99 Mn% + 0.4 Zn%

0.50

BER230-17

0

42

42

1.591

42 m @ 0.93 Cu% + 70.35 Ag g/t + 11.13 Mn% + 0.71 Zn%

0.50

BEP-008

BER231-17

0

5

5

1.009

5 m @ 0.47 Cu% + 31.94 Ag g/t + 7.93 Mn% + 0.88 Zn%

0.50

25

65

40

0.733

40 m @ 0.43 Cu% + 19.17 Ag g/t + 5.82 Mn% + 0.48 Zn%

0.50

BER232-17

1

6

5

2.063

5 m @ 1.19 Cu% + 71.58 Ag g/t + 15.74 Mn% + 1.19 Zn%

0.50

30

37

7

0.819

7 m @ 0.45 Cu% + 20.44 Ag g/t + 8.65 Mn% + 0.62 Zn%

0.50

96

102

6

0.849

6 m @ 0.57 Cu% + 27.93 Ag g/t + 3.07 Mn% + 0.32 Zn%

0.50

BER233-17

0

17

17

0.719

17 m @ 0.46 Cu% + 19.82 Ag g/t + 3.9 Mn% + 0.37 Zn%

0.50

BER234-17

0

23

23

1.101

23 m @ 0.73 Cu% + 33.39 Ag g/t + 5.12 Mn% + 0.47 Zn%

0.50

BEP-002

BER235-17

0

28

28

1.127

28 m @ 0.65 Cu% + 30.71 Ag g/t + 9.32 Mn% + 0.75 Zn%

0.50

39

59

20

1.163

20 m @ 0.57 Cu% + 78.73 Ag g/t + 8.05 Mn% + 0.45 Zn%

0.50

59

66

7

11.104

7 m @ 2.18 Cu% + 1,719.83 Ag g/t + 13.21 Mn% + 0.41

Zn%

0.50

BER236-17

0

44

44

1.498

44 m @ 0.9 Cu% + 85.63 Ag g/t + 8.42 Mn% + 0.38 Zn%

0.50

BEP-023

BER237-17

21

32

11

0.600

11 m @ 0.31 Cu% + 47.80 Ag g/t + 1.27 Mn% + 0.11 Zn%

0.50

35

46

11

1.464

11 m @ 0.86 Cu% + 94.43 Ag g/t + 10.49 Mn% + 0.29 Zn%

0.50

67

71

4

1.638

4 m @ 0.68 Cu% + 139.62 Ag g/t + 9.02 Mn% + 0.58 Zn%

0.50

81

85

4

0.654

4 m @ 0.45 Cu% + 22.43 Ag g/t + 3.74 Mn% + 0.21 Zn%

0.50

BER238-17

18

36

18

0.990

18 m @ 0.56 Cu% + 65.28 Ag g/t + 7.43 Mn% + 0.23 Zn%

0.50

82

92

10

1.182

10 m @ 0.79 Cu% + 61.03 Ag g/t + 3.98 Mn% + 0.19 Zn%

0.50

BER239-17

30

57

27

1.723

27 m @ 1.01 Cu% + 117.80 Ag g/t + 8.73 Mn% + 0.26 Zn%

0.50

88

100

12

1.828

12 m @ 0.82 Cu% + 177.05 Ag g/t + 5.27 Mn% + 0.26 Zn%

0.50

BER240-17

26

43

17

1.948

17 m @ 0.76 Cu% + 214.60 Ag g/t + 9.24 Mn% + 0.24 Zn%

0.50

43

49

6

3.221

6 m @ 2.96 Cu% + 34.65 Ag g/t + 13.04 Mn% + 0.2 Zn%

0.50

75

80

5

0.744

5 m @ 0.46 Cu% + 37.80 Ag g/t + 4.19 Mn% + 0.21 Zn%

1.50

BER241-17

20

61

41

1.334

41 m @ 0.69 Cu% + 113.22 Ag g/t + 4.84 Mn% + 0.15 Zn%

0.50

Platform

Hole Id

Comments

From (m)

To (m)

Interval (m)

% eCu Excl Mn

Summary

%eCu Cutoff

BEP-029

BER242-17

9

35

26

1.715

26 m @ 0.91 Cu% + 105.30 Ag g/t + 7.14 Mn% + 0.63 Zn%

0.50

48

57

9

1.661

9 m @ 0.72 Cu% + 165.57 Ag g/t + 3.94 Mn% + 0.23 Zn%

0.50

BER243-17

0

5

5

1.111

5 m @ 0.63 Cu% + 49.42 Ag g/t + 7.7 Mn% + 0.54 Zn%

1.50

16

21

5

1.364

5 m @ 0.57 Cu% + 101.48 Ag g/t + 16.57 Mn% + 0.66 Zn%

2.50

24

29

5

1.255

5 m @ 0.63 Cu% + 70.66 Ag g/t + 17.53 Mn% + 0.63 Zn%

3.50

32

36

4

2.068

4 m @ 1.31 Cu% + 110.70 Ag g/t + 19.29 Mn% + 0.46 Zn%

4.50

37

91

54

2.625

54 m @ 1.48 Cu% + 202.66 Ag g/t + 14.47 Mn% + 0.27

Zn%

5.50

37

45

8

6.091

8 m @ 2.09 Cu% + 754.13 Ag g/t + 20 Mn% + 0.38 Zn%

6.50

68

73

5

2.485

5 m @ 2.12 Cu% + 62.12 Ag g/t + 4.59 Mn% + 0.11 Zn%

7.50

BER244-17

0

6

6

1.463

6 m @ 1.18 Cu% + 32.25 Ag g/t + 2.23 Mn% + 0.27 Zn%

8.50

8

11

3

2.464

3 m @ 1.95 Cu% + 58.23 Ag g/t + 7.11 Mn% + 0.51 Zn%

9.50

14

32

18

1.963

18 m @ 1.2 Cu% + 110.81 Ag g/t + 16.13 Mn% + 0.47 Zn%

10.50

32

41

9

3.671

9 m @ 3.02 Cu% + 107.11 Ag g/t + 9.45 Mn% + 0.24 Zn%

11.50

41

51

10

2.359

10 m @ 1.24 Cu% + 177.18 Ag g/t + 18.11 Mn% + 0.5 Zn%

12.50

55

64

9

1.907

9 m @ 0.89 Cu% + 191.09 Ag g/t + 2.11 Mn% + 0.11 Zn%

13.50

BER245-17

3

15

12

1.221

12 m @ 0.79 Cu% + 48.40 Ag g/t + 8.9 Mn% + 0.42 Zn%

8.50

20

34

14

2.323

14 m @ 1.07 Cu% + 186.18 Ag g/t + 9.83 Mn% + 0.71 Zn%

9.50

22

30

8

3.149

8 m @ 1.47 Cu% + 252.96 Ag g/t + 12.95 Mn% + 0.93 Zn%

10.50

45

48

3

1.421

3 m @ 0.99 Cu% + 48.73 Ag g/t + 6.89 Mn% + 0.42 Zn%

11.50

52

64

12

2.326

12 m @ 0.85 Cu% + 243.52 Ag g/t + 15.69 Mn% + 0.55

Zn%

12.50

60

64

4

1.677

4 m @ 0.59 Cu% + 195.55 Ag g/t + 8.16 Mn% + 0.21 Zn%

13.50

BER246-17

0

3

3

0.890

3 m @ 0.52 Cu% + 16.50 Ag g/t + 19.09 Mn% + 0.67 Zn%

0.50

10

17

7

2.025

7 m @ 1.15 Cu% + 116.61 Ag g/t + 18.57 Mn% + 0.66 Zn%

0.50

22

29

7

0.657

7 m @ 0.52 Cu% + 16.89 Ag g/t + 2.43 Mn% + 0.12 Zn%

0.50

32

43

11

1.455

11 m @ 0.84 Cu% + 63.65 Ag g/t + 9.6 Mn% + 0.68 Zn%

0.50

51

53

2

1.165

2 m @ 0.46 Cu% + 105.90 Ag g/t + 6.36 Mn% + 0.39 Zn%

0.50

59

75

16

8.372

16 m @ 1.88 Cu% + 1,243.31 Ag g/t + 10.43 Mn% + 0.39

Zn%

0.50

59

62

3

2.828

3 m @ 1.12 Cu% + 293.73 Ag g/t + 10.99 Mn% + 0.5 Zn%

0.50

63

71

8

14.154

8 m @ 2.95 Cu% + 2,161.23 Ag g/t + 14.64 Mn% + 0.49

Zn%

0.50

*Intercepts are calculated using: True width intervals of the mineralisation are interpreted as being between 50-80% true widths from oriented RC drilling core and sectional interpretation

Copper equivalent (CuEq) calculations assume:

Base of Calculus

Units

Costs-LME (London Metal Exchange)

Recovery (%) Concentrate

Cu

US Dollars per tonne

6,353.50

0.85

Ag

US Dollars and cents per troy ounce

17.09

0.5

Zn

US Dollars per tonne

2,886.50

0.8

Mn grades are not considered for eCu calculus.

Valor Resources Ltd. published this content on 31 August 2017 and is solely responsible for the information contained herein.
Distributed by Public, unedited and unaltered, on 07 September 2017 08:47:08 UTC.

Original documenthttp://voyagerresources.net/asx/2017.08.31%20-%20Further%20Drill%20Results%20at%20Berenguela.pdf

Public permalinkhttp://www.publicnow.com/view/A75CA463AA6DBF6F4D6DF6905AD2AE39E1B22A50