Nordec Group Oyj press release
Nordec signed an implementation phase agreement with SRV on the delivery of the steel frame and frame installation of the northern part of the main building, including casting works for the
The Laakso hospital area will be renewed in the 2020s. Two new hospital buildings will be built in the valley and two protected hospital buildings will be renovated.
More information about the project: https://laaksonyhteissairaala.fi/
Client: Kiinteistöosakeyhtiö Laakson yhteissairaala (
Main contractor: SRV
Principal and architectural design: Laakson LATU (Tähti-
Structural, geo- and rock engineering: Unitas (
HVAC design, energy and life cycle design: Granlund
Nordec is actively involved in the
After competitive tendering, Nordec was selected to participate in the development phase of the project in 2022. In the weekly workshops, the frame solutions of the project's main building have been actively developed, and the feasibility and scheduling of the project have been considered and optimised together with the other parties in the alliance.
The main building has mainly 8 floors and a gross area of 95,000 m2. The implementation phase agreement now signed concerns the northern part of the main building, approximately 58,000 m2. Nordec's steel frame factory production is already underway and installation work on site will begin in
Nordec participates in the design control and design of the steel frame of the main building together with the main contractor SRV and Unitas (
The scope of Nordec's delivery includes the manufacture, delivery and installation of the steel frame in the northern part of the main building at the site, as well as the installation of concrete elements supplied by
Ilkka Hätönen, Project Manager of the alliance subproject of
For further information, please contact:
Heikki Alakarhu, Business Area Manager, +358-50-380 1715, heikki.alakarhu@nordec.com
Jaakko Köninki, Commercial Development Manager, +358-50-559 7129, jaakko.koninki@nordec.com
About Nordec
Nordec Group Oyj is one of the leading suppliers of steel frame structures and façade solutions for construction projects in the Nordic countries with a strong position in the Central and Eastern European (CEE) countries of
The company has long experience in the design, manufacture and installation of frame structures, facades and bridges. Nordec's main raw material is steel. The service offering includes single-storey buildings, multi-storey buildings, heavy industry buildings, bridges and façade structures.
Nordec's revenue in 2022 was
Further information about Nordec is available on the Company's website at www.nordec.com.
https://news.cision.com/nordec-group-oyj/r/nordec-signed-an-implementation-phase-agreement-with-srv-for-the-laakso-joint-hospital-project,c3894581
https://news.cision.com/nordec-group-oyj/i/20231208-084328,c3249802
https://news.cision.com/nordec-group-oyj/i/laakson-yhteissairaala-viistoilmakuva-lannesta,c3249803
(c) 2023 Cision. All rights reserved., source