LUKOIL STARTS EXPLORATION DRILLING AT BLOCK 12 IN MEXICO

Monday, August 16, 2021

<_a103a_updated style='display: none'> { 8/16/2021 11:32:20 AM }

LUKOIL started drilling its first exploration well at Block 12 located in the southern area of the Gulf of Mexico.

The Yoti West-1Exp well will be drilled by Valaris 8505 semisubmersible rig, which was transported to Block 12 after its successful work at Block 10 (the Sayulita-1EXP well). The exploration will focus on turbidite deposits of Upper and Lower Miocene. Water depth at the drilling site is 207 meters.

Drilling of the Yoti West-1Exp will provide geological and geophysical data needed to make a decision on further exploration of Block 12.

[Link]
Information
LUKOIL Upstream Mexico (part of LUKOIL Group) acquired licence for exploration and production of hydrocarbons at Block 12 in 2017 following the Shallow Water Bidding Round 2.1. The block is located 50 km off the coast, in the Gulf of Mexico (State of Tabasco, Mexico). Its surface area amounts to 521 square meters, with water depth varying from 150 to 400 m.
The Block 12 joint venture is formed by Eni (40%) and LUKOIL Upstream Mexico (operator, 60%). The parties' minimum obligations for the early stages of exploration are to drill one well.
  • Press release in PDF
Contact information

Press Centre PJSC 'LUKOIL'

media@lukoil.com

+7 (495) 627-16-77

http://www.lukoil.com

https://www.facebook.com/Lukoil.en

http://twitter.com/lukoilengl

You may be interested
02/08/2021 -SECOND OIL FINDING AT BLOCK 10 IN MEXICO

​LUKOIL announces a new oil finding in the Sayulita prospecting area of Block 10 offshore Mexico following the drilling of an exploratory well. The initial geological resources of the new accumulation may contain up to 200 Mboe in place. The Sayulita-1 EXP well is the second consecutive successful well drilled by the Company in partnership with the operator Eni as part of its Block 10 commitments. ​

22/07/2021 -LUKOIL LAUNCHES PRODUCTION OF ADVANCED POLYMER-BITUMEN BINDERS AT ITS NIZHNY NOVGOROD REFINERY

Deputy Prime Minister of the Russian Federation Yury Borisov, Governor of the Nizhny Novgorod region Gleb Nikitin and President of PJSC LUKOIL Vagit Alekperov took part in the ceremony of commissioning of a polymer-bitumen binders production unit at LUKOIL's Nizhny Novgorod refinery. The commissioning took place today in the city of Kstovo (Nizhny Novgorod region). ​

22/07/2021 -LUKOIL LAYS THE CORNER STONE FOR NEW POLYPROPYLENE COMPLEX AT ITS NIZHNY NOVGOROD REFINERY

Today, Deputy Prime Minister of the Russian Federation Yury Borisov, Governor of the Nizhny Novgorod region Gleb Nikitin and President of LUKOIL Vagit Alekperov took part in the foundation stone laying ceremony for the Polypropylene Production Complex at LUKOIL's Nizhny Novgorod refinery in the city of Kstovo. ​​

Find similar

Attachments

  • Original document
  • Permalink

Disclaimer

OAO Lukoil published this content on 16 August 2021 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 16 August 2021 08:41:10 UTC.