At the industrial site of Ufa Oil Refinery - a branch of Bashneft-Ufaneftekhim - the retrofitting of rector sector of catalytic cracking vacuum gasoil hydrofining plant was completed aimed at expansion of Euro-5 high-octane petrols production from dark petroleum oils.

The retrofitting contributed to 4.7% growth of the plant average daily output by volumes of vacuum gasoil treatment and 11.8% growth in terms of stable petrol production. Additionally, due to the retrofitting the average life of the catalyst used in the process was doubled - from 2 to 4 years.

The project was implemented during the plant scheduled overhaul 8 days ahead of the schedule. This was due to a high qualification level and thoughtful technical solutions offered by the company's employees.

OAO Bashneft published this content on 21 November 2016 and is solely responsible for the information contained herein.
Distributed by Public, unedited and unaltered, on 22 November 2016 07:33:09 UTC.

Original documenthttp://www.bashneft.com/press/releases/8985/

Public permalinkhttp://www.publicnow.com/view/AD670144D831935743850FF77AB6A3718DC8A5BF